Gazprom to sign memo with Linde for third line of Ust-Luga LNG plant

Gazprom to sign memo with Linde for third line of Ust-Luga LNG plant
Gazprom to sign memo with Linde for third line of Ust-Luga LNG plant   -   Copyright  Thomson Reuters 2021   -  
By Reuters

<div> <p><span class="caps">MOSCOW</span> – The board of Russia’s Gazprom has approved signing a memorandum with Linde and RusKhimAlyans to build a third line at a liquefied natural gas (<span class="caps">LNG</span>) plant at the Baltic Sea port of Ust-Luga, Gazprom said on Friday.</p> <p>The <span class="caps">LNG</span> plant is a part of a gas chemical complex that will include a plant with annual capacity to process 45 billion cubic metres of gas and a 13 million tonnes per year <span class="caps">LNG</span> plant. The complex is expected to start production in 2024-2025.</p> <p/> </div>